Engagement Results from Downtown Designing (Community Workshop #2)

On March 4th, 2026, the Downtown Master Plan team hosted their second major community workshop, Downtown Designing, at Greyline Station. These boards contain the results of this workshop, as well as the online survey that was hosted alongside it. They contain feedback from Lexington residents on the major goals of the plan, including creating a connected downtown, improving visitor experience, supporting the unhoused population, and building more housing at various price points.

Click the button below to review the engagement results, or come see a final draft of the plan at our next workshop on May 7th at Phoenix Park!

Next
Next

Downtown Designing Community Meeting Boards